==Insulation== | ==Insulation== | ||
Insulation | Insulation was done before replacing boiler, to see how much smaller a boiler we can get. | ||
===Attic=== | |||
Snug Planet lifted fiberglass fill and batting to reveal and seal holes between 3rd floor and attic; put existing insulation back; added enough cellulose insulation to get to R49. The hatch was insulated with rigid foam. Snug also sealed and filled to R49 all four knee wall attic spaces. | |||
The hatch still needs weatherstripping between it and the frame on which it rests. | |||
===Exterior walls=== | |||
Snug Planet filled the following exterior walls with blown cellulose: | |||
*All second floor walls. Previously, only the walls around the east facing room were insulated. | |||
*All third floor horizontal walls. Sloped walls supposedly were filled from above during the attic job. | |||
*First floor walls above and beside windows, but not directly below windows. | |||
===Basement ceiling=== | ===Basement ceiling=== | ||
;Repair asbestos | ;Repair asbestos | ||
===Rim joists=== | ===Rim joists=== | ||
;Spray foam | ;Spray foam | ||
===Air | ===Air sealing=== | ||
Hole in stairway wall on 1st floor. | Hole in stairway wall on 1st floor between stairway and kitchen. | ||
==Heating== | ==Heating== |
Revision as of 12:35, 22 November 2011
Insulation
Insulation was done before replacing boiler, to see how much smaller a boiler we can get.
Attic
Snug Planet lifted fiberglass fill and batting to reveal and seal holes between 3rd floor and attic; put existing insulation back; added enough cellulose insulation to get to R49. The hatch was insulated with rigid foam. Snug also sealed and filled to R49 all four knee wall attic spaces.
The hatch still needs weatherstripping between it and the frame on which it rests.
Exterior walls
Snug Planet filled the following exterior walls with blown cellulose:
- All second floor walls. Previously, only the walls around the east facing room were insulated.
- All third floor horizontal walls. Sloped walls supposedly were filled from above during the attic job.
- First floor walls above and beside windows, but not directly below windows.
Basement ceiling
- Repair asbestos
Rim joists
- Spray foam
Air sealing
Hole in stairway wall on 1st floor between stairway and kitchen.
Heating
New heating systems will probably qualify for a tax credit.
Natural Gas Boiler
- Needs
- AFUE > 90%
- Sealed combustion (brings outside air for combustion via a pipe). May require new flue, or check chimney lining to see if acid-proof.
- Electronic ignition
- Heat exchanger on flue gases?
- Brands
- WEIL-McLAIN:Top models have sealed combustion
- Buderus
- Triangle Tube
- Peerless
- Burnham
Hot water
Some boilers will also provide hot water for plumbing.
PV system
Fire escape
Windows
- Repair cracked glass
- LR SW
- 1.5 landing
- Storms
- Re-glaze
- 3rd floor SW windows
- New sash
- 3rd floor bath
Steps
Bathrooms
toilets