Basement: Difference between revisions

From ShawnReevesWiki
Jump to navigationJump to search
No edit summary
 
Line 9: Line 9:
See [[Choosing a boiler]].
See [[Choosing a boiler]].


[[Category:House and Home]]
[[Category:House and home]]

Latest revision as of 21:17, 10 April 2012

Cement Flooring

Our basement (2009) is a crumbling cement floor with a coat of red paint. A small amount of air and/or moisture probably comes through the floor, gets trapped under the paint, and forms bubbles. Then walking or scraping the floor causes crumbling of the paint, exposing crumbling cement.

I have been looking into adding leveling compound. Level X-52 looks pretty good.

Should we do this project at the same time as replacing the boiler and insulating the rim joist and basement walls?

Appliances

See Choosing a boiler.